{"id":71715,"date":"2017-11-14T11:10:23","date_gmt":"2017-11-14T04:10:23","guid":{"rendered":"http:\/\/www.siamlandbank.com\/propertynews\/property-news\/bukit-brown-road-unlikely-to-be-ready-this-quarter\/"},"modified":"2017-11-14T12:05:16","modified_gmt":"2017-11-14T05:05:16","slug":"bukit-brown-road-unlikely-to-be-ready-this-quarter","status":"publish","type":"post","link":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/bukit-brown-road-unlikely-to-be-ready-this-quarter\/","title":{"rendered":"Bukit Brown road unlikely to be ready this quarter"},"content":{"rendered":"<p>&#013;<br \/>\nIn order to ease traffic congestion, the LTA has awarded Swee Hong Limited the contract ER 382, Construction of New Road between Adam Flyover and MacRitchie Viaduct. (Photo: Swee Hong)<br \/>\nThe $134.7 million road in Bukit Brown was originally targeted for completion in end-2017, but motorists and residents affected by the construction will have to wait a little longer for it to finish, reported the Straits Times.<br \/>\nIn August 2013, the Land Transport Authority (LTA) awarded the contract to build the dual four-lane road connecting Adam Road with MacRitchie viaduct via the Bukit Brown cemetery to Singapore-listed contractor Swee Hong.<br \/>\nHowever, the civil engineering group encountered cashflow issues thereafter, and filed an application to the High Court to deliberate on a debt restructuring plan for its creditors in 2015.<br \/>\nWhile the company announced last July that it had repaid its loans, the financial problem had already caused delays in the project, and the grave exhumation took longer than expected.<br \/>\nAs such, the road appears far from ready as of Monday (13 November), and a person living in the vicinity revealed that government officials said that the road will be finished by late-2018.<br \/>\n\u201cI\u2019m not even sure it can be done by then. It\u2019s causing us a lot of inconvenience already,\u201d said the retiree in his 70s who wanted to remain anonymous. He added that aside from the noise and dust of the construction, cracks had formed in some houses in the area.<br \/>\n\u00a0<br \/>\nThis article was edited by Keshia Faculin.&#013;<br \/>\n&#013;<br \/>\nSource : proppertyguru.com.sg\/Property Market&#013;<br \/>\nRead more&#8230;<a href=\"http:\/\/www.propertyguru.com.sg\/property-management-news\/2017\/11\/164830\/bukit-brown-road-unlikely-to-be-ready-this-quarter\" target=\"_blank\">Bukit Brown road unlikely to be ready this quarter<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#013; In order to ease traffic congestion, the LTA has awarded Swee Hong Limited the contract&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"false","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true},"categories":[1],"tags":[],"class_list":["post-71715","post","type-post","status-publish","format-standard","hentry","category-property-news"],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p75ss1-iEH","jetpack-related-posts":[{"id":110659,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/construction-work-for-5-stations-on-jurong-region-line-to-commence-in-2020\/","url_meta":{"origin":71715,"position":0},"title":"Construction work for 5 stations on Jurong Region Line to commence in 2020","date":"September 11, 2019","format":false,"excerpt":"\r The 24km line will feature 24 stations, including three interchange stations, providing direct connectivity between the western and north-western regions of Singapore. Two civil contracts for the construction of five MRT stations along the Jurong Region Line (JRL) has been awarded by the Land Transport Authority (LTA), with the\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":120975,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/construction-works-on-ang-mo-kio-mrt-interchange-station-to-commence-in-q4\/","url_meta":{"origin":71715,"position":1},"title":"Construction works on Ang Mo Kio MRT interchange station to commence in Q4","date":"July 21, 2021","format":false,"excerpt":"\r The new CRL station will allow commuters to save 70 minutes of travel time between Ang Mo Kio and Aviation Park, bringing it to just 35 minutes. Travel time from Ang Mo Kio to Pasir Ris will also be reduced to 25 minutes from one hour. The Land Transport\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/www.siamlandbank.com\/propertynews\/wp-content\/uploads\/2021\/07\/Cross-Island-Line-Extension-4-stations.png?fit=820%2C392&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":83517,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/makeway-view-sold-for-168m-to-bukit-sembawang\/","url_meta":{"origin":71715,"position":2},"title":"Makeway View sold for $168m to Bukit Sembawang","date":"March 23, 2018","format":false,"excerpt":"\r Makeway View comprises 28 apartments and four penthouses, and is close to Newton MRT interchange. (Photo: Edmund Tie & Co) The freehold Makeway View condominium in Newton has been sold to Bukit Sembawang Estates for $168 million, marketing agent Edmund Tie & Co said on Thursday (22 Mar). Completed\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":68892,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/another-condo-goes-en-bloc-this-time-in-bukit-timah\/","url_meta":{"origin":71715,"position":3},"title":"Another condo goes en bloc, this time in Bukit Timah","date":"October 12, 2017","format":false,"excerpt":"\r Built in the 1980s, Royalville comprises 93 apartments and 11 shops. (Photo: Edmund Tie & Company) The en bloc frenzy continues after Royalville at Bukit Timah Road became the latest project to be put up for sale on Thursday (12 October). The freehold condominium in District 10 joins a\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":61278,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/qingjian-realty-to-launch-first-mixed-use-development\/","url_meta":{"origin":71715,"position":4},"title":"Qingjian Realty to launch first mixed-use development","date":"July 20, 2017","format":false,"excerpt":"\r Its first mixed-use development, Qingjian\u2019s Le Quest\u00a0will house a smart food court run by Koufu Pte Ltd and an NTUC Fairprice Finest. (Image: Qingjian Realty) Le Quest, Qingjian Realty\u2019s first mixed-use development in Bukit Batok, will be opened for preview this weekend (22 July). Set to be completed in\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":38755,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/more-biz-needed-around-malaysia-singapore-rapid-transit-line\/","url_meta":{"origin":71715,"position":5},"title":"More biz needed around Malaysia-Singapore rapid transit line","date":"December 21, 2016","format":false,"excerpt":"\r Job creation will reinvigorate property scene Permas Jaya in Johor Malaysia. Yusoff Jalil\/Shutterstock While Singapore and Malaysia are set to be closer than ever through the construction of the Rapid Transit System (RTS), the areas\u00a0around the line still lack enough economic activity to foster a fast-growing real estate market.\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/71715"}],"collection":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/comments?post=71715"}],"version-history":[{"count":0,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/71715\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/media?parent=71715"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/categories?post=71715"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/tags?post=71715"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}