{"id":16278,"date":"2016-06-12T21:03:37","date_gmt":"2016-06-12T14:03:37","guid":{"rendered":"http:\/\/www.siamlandbank.com\/propertynews\/?p=16278"},"modified":"2016-06-12T19:11:41","modified_gmt":"2016-06-12T12:11:41","slug":"alubond-stops-making-plastic-filled-cladding-used-in-the-address-downtown-dubai","status":"publish","type":"post","link":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/alubond-stops-making-plastic-filled-cladding-used-in-the-address-downtown-dubai\/","title":{"rendered":"Alubond stops making plastic-filled cladding used in The Address Downtown Dubai"},"content":{"rendered":"<p>&#013;<br \/>\nThe company that supplied the facade cladding of the Dubai hotel that erupted in a blaze on New Year&#8217;s Eve has scrapped the manufacture of plastic-filled panels. Alubond, the world&#8217;s largest maker of aluminium composite panels and the company that supplied The Address Downtown Dubai, will no longer make the controversial panels containing cores known by the industry shorthand of LDPE (low-density polythene). &#8220;We have put a stop to LDPE production in the plant,&#8221; said Shaji Ul Mulk, the chairman of Mulk Holdings, which owns Alubond. &#8220;It&#8217;s a decision we took a few days back. We hope our competitors will follow suit.&#8221; He said the move would not just affect the company&#8217;s UAE business, but also more than 20 countries where it exports aluminium composite panels made in its Hamriyah factory. The Address Downtown Dubai took just minutes to erupt in a spectacular ball of fire after the alarm was raised by some residents in the building at about 9.30pm on December 31 last year. It was the latest in a string of tower facade fires linked to the use of highly flammable aluminium cladding panels. Less than three months later another massive blaze broke out in a high-rise block of flats in Ajman that was also covered with such materials. Almost six months on from the Address blaze, officials have yet to reveal in detail what works will be required to improve the safety of hundreds of high-rise buildings across the country known to be covered with highly flammable panels filled with plastic cores. Three of the world&#8217;s top aluminium composite panel makers told The National in February that regional demand for their most fire-retardant panels was almost non-existent. One major manufacturer said it has supplied just one project with non-combustible panels in five years. Such panels are about 30 per cent more expensive than the flammable alternatives that have a high proportion of plastic, say manufacturers. But an updated fire and life safety code is expected to effectively end the use of plastic-filled panels on high-rise structures by stipulating tests, which are only likely to be met by the most fire-retardant materials containing little or no plastic.The fire safety of buildings is coming under focus during a tough period for the regional construction sector, as some projects are delayed or stopped amid weakening sentiment. &#8220;A lot of companies are struggling, a lot of cheques are bouncing,&#8221; Mr Mulk said. &#8220;Eventually you get paid, but the cycle is longer.&#8221;scronin@thenational.aeFollow The National&#8217;s Business section on Twitter&#013;<br \/>\n&#013;<br \/>\nSource : thenational.ae&#013;<br \/>\nRead more&#8230;<a href=\"http:\/\/www.thenational.ae\/business\/property\/alubond-stops-making-plastic-filled-cladding-used-in-the-address-downtown-dubai\" target=\"_blank\">Alubond stops making plastic-filled cladding used in The Address Downtown Dubai<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#013; The company that supplied the facade cladding of the Dubai hotel that erupted in a&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"false","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true},"categories":[1],"tags":[],"class_list":["post-16278","post","type-post","status-publish","format-standard","hentry","category-property-news"],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p75ss1-4ey","jetpack-related-posts":[{"id":4136,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/shaji-ul-mulk-the-man-the-facade-and-the-address-downtown-dubai-fire\/","url_meta":{"origin":16278,"position":0},"title":"Shaji Ul Mulk: the man, the facade and The Address Downtown Dubai fire","date":"February 9, 2016","format":false,"excerpt":"\r \r Shaji Ul Mulk is the man behind the facades of a thousand towers.The billionaire Indian businessman runs the world's biggest maker of aluminium panels found on skyscrapers worldwide.One of those was The Address Downtown Dubai, which on New Year's Eve took minutes to erupt in a spectacular ball\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4134,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/exclusive-qa-shaji-ul-mulk-reveals-untold-story-of-the-address-downtown-dubai-fire\/","url_meta":{"origin":16278,"position":1},"title":"Exclusive Q&amp;A: Shaji Ul Mulk reveals untold story of The Address Downtown Dubai fire","date":"February 9, 2016","format":false,"excerpt":"\r \r How can other buildings be made safer after the fire?The Address is one issue. But it is done. What is important now is the question, \"What are we going to do with the hundreds of towers that pose a similar risk?\" That is the bigger issue. We are\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":23529,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/uae-cladding-firms-invest-in-upgrades-to-produce-more-fire-resistant-panels\/","url_meta":{"origin":16278,"position":2},"title":"UAE cladding firms invest in upgrades to produce more fire-resistant panels","date":"August 22, 2016","format":false,"excerpt":"\r A race between two Indian tycoons in the UAE to open the country's first factory capable of producing A2-standard fire-resistant panels looks to have been won by Danube Group's Rizwan Sajan.Danube Group, which produces the Alucopanel cladding range under licence in the Middle East from its factory in Dubai\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":4793,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/most-fire-resistant-panels-still-being-ignored-for-uae-towers-despite-spate-of-blazes\/","url_meta":{"origin":16278,"position":3},"title":"Most fire-resistant panels still being ignored for UAE towers despite spate of blazes","date":"February 15, 2016","format":false,"excerpt":"\r \r The most fire-retardant wall panels are still not being used on buildings across the country, despite a spate of facade blazes.Three of the world's top alu\u00admin\u00adium composite panel makers have confirmed that demand for their highest-rated panels is almost non-existent across the region. And an updated building code\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":58398,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/grenfell-tower-fire-disaster-in-london-could-never-happen-in-dubai-experts-say\/","url_meta":{"origin":16278,"position":4},"title":"Grenfell Tower fire disaster in London could never happen in Dubai, experts say","date":"June 20, 2017","format":false,"excerpt":"\r A tragedy such as the Grenfell Tower fire, which is estimated to have claimed 79 lives in London last week, could never happen in Dubai, panel manufacturers claim, following the introduction of new rules at the start of the year. Images of firefighters attempting to fight the flames and\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":23633,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/handover-of-dubai-projects-delayed-as-authorities-get-tough-on-fire-safety\/","url_meta":{"origin":16278,"position":5},"title":"Handover of Dubai projects delayed as authorities get tough on fire safety","date":"August 23, 2016","format":false,"excerpt":"\r About \"270 or more\" building projects across Dubai have witnessed delays to handover as authorities have become much stricter in ensuring that cladding systems meet building and fire-safety standards, according to experts.New building codes which will demand higher-rated cladding panels are currently being circulated among consultants, and manufacturers of\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/16278"}],"collection":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/comments?post=16278"}],"version-history":[{"count":0,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/16278\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/media?parent=16278"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/categories?post=16278"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/tags?post=16278"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}