{"id":118252,"date":"2020-08-17T11:14:53","date_gmt":"2020-08-17T04:14:53","guid":{"rendered":"http:\/\/www.siamlandbank.com\/propertynews\/property-news\/new-condo-residents-frustrated-over-delayed-rectification-works-due-to-covid-19\/"},"modified":"2020-08-17T12:06:59","modified_gmt":"2020-08-17T05:06:59","slug":"new-condo-residents-frustrated-over-delayed-rectification-works-due-to-covid-19","status":"publish","type":"post","link":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/new-condo-residents-frustrated-over-delayed-rectification-works-due-to-covid-19\/","title":{"rendered":"New condo residents frustrated over delayed rectification works due to COVID-19"},"content":{"rendered":"<p>&#013;<br \/>\nDevelopers say that it\u2019s difficult to provide rectification works as the government has halted all construction works in April.\u00a0<br \/>\nWith the COVID-19 pandemic disrupting renovation and construction works, some residents at new condominium projects have no choice but to live with the defects in their units for months.<br \/>\nResidents at The Alps Residences, for instance, revealed that they had filed numerous defect forms with the project\u2019s developer \u2013 MCC Land \u2013 since they received the keys to their units in October. They noted, however, that management had been slow with replies, while repairs have been dragged out due to the pandemic, reported TODAY.<br \/>\nRelated:\u00a0Post-Circuit Breaker: Can You Resume Renovation Works Immediately?<br \/>\nLocated at 115 Tampines Street 86, the 99-year leasehold condo features 626 units and had been granted Temporary Occupation Permit (TOP) on 27 September 2019.<br \/>\nA 31-year old resident, who wanted to be identified only as Mrs Zhu, said the glass panels in her unit had scratches, while the marble walls in the bathroom had white stains. Her bedroom\u2019s door frame had also split and fallen from the wall.<br \/>\nAlthough she reported the defects in November, she only had the door frame fixed on 24 July. Mrs Zhu is still waiting for the developer to replace the glass panels.<br \/>\nA 39-year old resident, who wanted to be known only as Mr Shashi, found popped tiles as well as wallpaper peeling off due to water damage within his apartment two weeks before moving in the unit in February.<br \/>\nWhen contacted on 14 August, Mr Shashi told TODAY that he has not yet resolved the issues in his unit with the developer.<br \/>\nEdward Quek and Janelle Quek, on the other hand, found various defects since collecting the keys for their penthouse unit, which they acquired for around $1.6 million.<br \/>\nAmong the defects seen at their new home included popped tiles, scratch marks on marble flooring and wall cracks. They added that a glass door at one of the bathrooms had also shattered for no apparent reason.<br \/>\nThe siblings noted that while some repair works had been initiated in February prior to the circuit breaker period, many of the defects remain unresolved. In fact, some of the defects such as the wall cracks had recently resurfaced.<br \/>\nSeparately, residents Gem Residences, faced water pressure issues since January when they started collecting the keys to their units.<br \/>\nA resident, who wanted to be identified only as Ms C K, said the project\u2019s management agent had been slow in responding to the various issues raised by residents during the circuit breaker period.<br \/>\nRecommended article:\u00a07,862 Units Across 8 Estates\u2014What To Expect From HDB\u2019s Largest BTO Launch To Date (August 2020)<br \/>\nThe 41-year old private investor noted that while communication with the project\u2019s developer, Evia Real Estate, had improved since the end of the lockdown in June, some outstanding matters \u2013 such as common area defects and water pressure issues \u2013 are yet to be addressed.<br \/>\nMeanwhile, a spokesperson for MCC Land explained that they had been conducting rectification works at some of the units at The Alps since they handed over the keys to buyers in October 2019.<br \/>\nHowever, rectification works at some units had been affected by the government\u2019s decision to halt all construction works in April.<br \/>\nNonetheless, the developer had recently obtained government approval to progressively restart rectification works.<br \/>\n\u201cAlthough we are not operating at our optimal manpower strength during this period, we are doing our best to complete as much rectification work as we can,\u201d said the MCC Land\u2019s spokesperson as quoted by TODAY.<br \/>\nEvia Real Estate\u2019s spokesperson, on the other hand, revealed that they can only resume the bulk of rectification works at the end of this month. This comes as they are facing challenges with manpower.<br \/>\n\u201cAlthough the authorities have announced the release of workers from purpose-built dormitories, there are a lot of other stringent requirements to meet in terms of safe accommodation and safe workplace,\u201d she said as quoted by TODAY.<br \/>\n\u201cAll this coupled with the backlog of cases which have built up over the circuit breaker period mean we are hard pressed to meet the defect rectification deadlines.\u201d<br \/>\nLooking for a property in Singapore? Visit\u00a0PropertyGuru\u2019s\u00a0Listings,\u00a0Project Reviews\u00a0and\u00a0Guides.<br \/>\nVictor Kang, Digital Content Specialist at PropertyGuru, edited this story. To contact him about this or other stories, email\u00a0victorkang@propertyguru.com.sg<br \/>\n\u00a0&#013;<br \/>\n&#013;<br \/>\nSource : proppertyguru.com.sg\/Property Market&#013;<br \/>\nRead more&#8230;<a href=\"https:\/\/www.propertyguru.com.sg\/property-management-news\/2020\/8\/191507\/new-condo-residents-frustrated-over-delayed-rectification-works-due-to-covid-19\" target=\"_blank\">New condo residents frustrated over delayed rectification works due to COVID-19<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#013; Developers say that it\u2019s difficult to provide rectification works as the government has halted all&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"false","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true},"categories":[1],"tags":[],"class_list":["post-118252","post","type-post","status-publish","format-standard","hentry","category-property-news"],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p75ss1-uLi","jetpack-related-posts":[{"id":118621,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/waterway-terraces-ii-residents-finally-relieved-with-facades-rectification-works\/","url_meta":{"origin":118252,"position":0},"title":"Waterway terraces II residents finally relieved with fa\u00e7ade\u2019s rectification works","date":"September 15, 2020","format":false,"excerpt":"\r Residents of block 310A can finally breathe a sigh of relief. Photo: Google Street View Residents of a public housing block in Punggol were relieved that the large, highly-visible crack on the block\u2019s exterior wall has finally been repaired, a month after residents had raised concerns to the authorities,\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":33450,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/defects-in-new-hdb-flats-covered-by-a-one-year-warranty-mnd\/","url_meta":{"origin":118252,"position":1},"title":"Defects in new HDB flats covered by a one-year warranty: MND","date":"November 8, 2016","format":false,"excerpt":"\r New flats owners are also offered extended warranty coverage for three major types of defects.\u00a0 Rectification of defects in new HDB flats are covered by a warranty under the one-year Defects Liability Period (DLP), said the Ministry of National Development (MND). Aside from this, new flat owners are also\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":116717,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/suspended-renovation-works-building-works-for-landed-homes-to-resume-from-2-june\/","url_meta":{"origin":118252,"position":2},"title":"Suspended renovation works, building works for landed homes to resume from 2 June","date":"May 28, 2020","format":false,"excerpt":"\r Companies intending to restart suspended renovation works will have to secure BCA\u2019s approval. Renovations works for residential units which do not require building plan submission as well as building works on single dwelling residential properties that were disrupted during the circuit breaker period can resume from 2 June. However,\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":139141,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/are-fewer-hdb-owners-chasing-condo-dream-record-monthly-number-of-million-dollar-hdb-transactions-in-august-2023-and-more\/","url_meta":{"origin":118252,"position":3},"title":"Are Fewer HDB Owners Chasing Condo Dream, Record Monthly Number of Million-dollar HDB Transactions in August 2023, and More","date":"September 11, 2023","format":false,"excerpt":"\r Are Fewer HDB Owners Chasing Condo Dream, Record Monthly Number of Million-dollar HDB Transactions in August 2023, and More5 to 11 September 2023 Fewer HDB flat owners are pursuing their aspirations to upgrade to condominiums following a series of property cooling measures, rising mortgage rates, increasing private home prices\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/www.siamlandbank.com\/propertynews\/wp-content\/uploads\/2023\/09\/private-home-hdb-1.jpg?fit=820%2C410&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":117140,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/more-than-19000-suspended-home-renovation-projects-given-green-light-to-resume\/","url_meta":{"origin":118252,"position":4},"title":"More than 19,000 suspended home renovation projects given green light to resume","date":"June 15, 2020","format":false,"excerpt":"\r BCA noted that the resumption of renovation works will depend on the companies\u2019 availability of supplies and manpower. The Building and Construction Authority (BCA) on Saturday (13 June) announced that over 19,000 suspended home renovation projects have been given the approval to resume work. New home renovation works as\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":116824,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/wong-urges-renovation-contractors-to-patiently-work-through-guidelines\/","url_meta":{"origin":118252,"position":5},"title":"Wong urges renovation contractors to patiently work through guidelines","date":"June 2, 2020","format":false,"excerpt":"\r Although there are \u201cquite a few\u201d guidelines, these are necessary and Wong called on all parties involved to work through these new requirements systematically and patiently. Contractors and homeowners must comply with safety requirements to minimise the spread of Covid-19 if they want to resume renovation works, says National\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/118252"}],"collection":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/comments?post=118252"}],"version-history":[{"count":0,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/118252\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/media?parent=118252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/categories?post=118252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/tags?post=118252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}