{"id":116467,"date":"2020-05-18T11:45:55","date_gmt":"2020-05-18T04:45:55","guid":{"rendered":"http:\/\/www.siamlandbank.com\/propertynews\/property-news\/construction-works-for-some-projects-may-be-allowed-to-resume-after-circuit-breaker\/"},"modified":"2020-05-18T12:10:20","modified_gmt":"2020-05-18T05:10:20","slug":"construction-works-for-some-projects-may-be-allowed-to-resume-after-circuit-breaker","status":"publish","type":"post","link":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/construction-works-for-some-projects-may-be-allowed-to-resume-after-circuit-breaker\/","title":{"rendered":"Construction works for some projects may be allowed to resume after circuit breaker"},"content":{"rendered":"<p>&#013;<br \/>\nConstruction works for critical and time-sensitive projects will be allowed to resume when the circuit breaker ends on 1 June, as long as the contractors meet the COVID-19 safety measures.\u00a0<br \/>\nThe move is expected to double the 20,000 construction workers currently working on some critical infrastructure projects, including MRT projects, BTO projects and sewerage system tunnelling works, reported TODAY.<br \/>\nHugh Lim, Chief Executive of Building and Construction Authority (BCA), revealed that 5% of the construction workforce or another 20,000 workers will be allowed to return to work as part of this gradual restart.<br \/>\nHe noted that the workers should be tested for Covid-19 first, while the resumption of works will require BCA\u2019s approval depending on whether the employers could ensure a safe restart in view of the Covid-19 pandemic.<br \/>\n\u201cA Covid-safe workforce is critical to a successful restart of the construction sector. Employers will be required to demonstrate that they are able to meet the criteria before they are allowed to restart,\u201d said Lim.<br \/>\nThe criteria include having a system that enables employers to track their workers\u2019 health on a daily basis and regular Covid-19 tests for workers.<br \/>\nDedicated transport must also be catered for between the workers\u2019 accommodation and the worksites. During the ride, workers should be seated at a safe distance from each other.<br \/>\nThe capacity would be halved for transports in open air setting, like in the back of a lorry.<br \/>\nNational Development Minister Lawrence Wong said the government may also consider resuming renovation works if contractors can ensure that such works can be done safely, including work arrangements, housing and transport of workers, under the new Covid-safe rules.<br \/>\nOther measures that must be undertaken by employers include the appointment of safe management officers who will implement safety rules across the worksite, the putting up of health advisory infographics and posters in the native languages of workers, and the use of technology-enabled processes, such as the SafeEntry system, to facilitate effective tracking and compliance within specific zones of the worksite.<br \/>\nEmployers should also ensure safe distancing and reduced physical interaction at worksites. Workers performing different activities must also be segregated, while cross-deployment will not be allowed between workers in different teams, shifts and worksites.<br \/>\nEmployers are also mandated to provide workers with individually packed meals and personal tableware as well as masks while at the worksite.<br \/>\nTo ensure compliance, an audit and inspection will be conducted at the resumed project worksites, said Lim.<br \/>\nHe also revealed that the authorities are working through the list of projects for restart, which includes HDB BTO projects on the \u201cpriority list\u201d.<br \/>\nRelated:\u00a0East or West? HDB\u2019s May 2020 BTO Launch at Bukit Batok, Choa Chu Kang, Tengah, Pasir Ris, and Tampines<br \/>\n\u201cWe have a list of projects we have identified, these are mainly critical and time-sensitive ones, it is on the basis of the merits of the project, it\u2019s on the basis on whether the contractor is ready and has the safeguards in place, even if the project is meritorious,\u201d said Wong, who also serves as the co-chair of the multi-ministry task force leading Singapore\u2019s response to Covid-19.<br \/>\nLooking for a property in Singapore? Visit\u00a0PropertyGuru\u2019s\u00a0Listings,\u00a0Project Reviews\u00a0and\u00a0Guides.<br \/>\nVictor Kang, Digital Content Specialist at PropertyGuru, edited this story. To contact him about this or other stories, email\u00a0victorkang@propertyguru.com.sg&#013;<br \/>\n&#013;<br \/>\nSource : proppertyguru.com.sg\/Property Market&#013;<br \/>\nRead more&#8230;<a href=\"https:\/\/www.propertyguru.com.sg\/property-management-news\/2020\/5\/188397\/construction-works-for-some-projects-may-be-allowed-to-resume-after-circuit-breaker\" target=\"_blank\">Construction works for some projects may be allowed to resume after circuit breaker<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#013; Construction works for critical and time-sensitive projects will be allowed to resume when the circuit&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"false","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true},"categories":[1],"tags":[],"class_list":["post-116467","post","type-post","status-publish","format-standard","hentry","category-property-news"],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p75ss1-uiv","jetpack-related-posts":[{"id":116717,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/suspended-renovation-works-building-works-for-landed-homes-to-resume-from-2-june\/","url_meta":{"origin":116467,"position":0},"title":"Suspended renovation works, building works for landed homes to resume from 2 June","date":"May 28, 2020","format":false,"excerpt":"\r Companies intending to restart suspended renovation works will have to secure BCA\u2019s approval. Renovations works for residential units which do not require building plan submission as well as building works on single dwelling residential properties that were disrupted during the circuit breaker period can resume from 2 June. However,\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":116886,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/over-5400-renovation-projects-get-green-light-to-resume-works\/","url_meta":{"origin":116467,"position":1},"title":"Over 5,400 renovation projects get green light to resume works","date":"June 4, 2020","format":false,"excerpt":"\r BCA noted that new applications to resume renovation works will be approved in two days provided \u201cthe submission is in order\u201d. The Building and Construction Authority (BCA) on Wednesday (3 June) announced that it had cleared and approved more than 5,400 residential renovation projects to resume work. It noted\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":116814,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/hdb-to-offer-7800-bto-flats-in-august-sales-exercise\/","url_meta":{"origin":116467,"position":2},"title":"HDB to offer 7,800 BTO flats in August sales exercise","date":"June 1, 2020","format":false,"excerpt":"\r The BTO exercise which was originally scheduled for May, will be combined with August\u2019s launch.\u00a0 The Housing and Development Board (HDB) will combine the Build-To-Order (BTO) exercise originally set for launch in May with the August BTO exercise, it said in a release on 29 May. This means HDB\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":117140,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/more-than-19000-suspended-home-renovation-projects-given-green-light-to-resume\/","url_meta":{"origin":116467,"position":3},"title":"More than 19,000 suspended home renovation projects given green light to resume","date":"June 15, 2020","format":false,"excerpt":"\r BCA noted that the resumption of renovation works will depend on the companies\u2019 availability of supplies and manpower. The Building and Construction Authority (BCA) on Saturday (13 June) announced that over 19,000 suspended home renovation projects have been given the approval to resume work. New home renovation works as\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":122565,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/two-thirds-of-bto-projects-completed-during-the-pandemic-delayed-no-more-than-six-months\/","url_meta":{"origin":116467,"position":4},"title":"Two-thirds of BTO projects completed during the pandemic delayed no more than six months","date":"October 13, 2021","format":false,"excerpt":"\r 17 BTO projects completed during the pandemic did not see a delay past six months, with 16,000 flats being delivered since January 2020. Flat buyers at 17 Build-to-Order (BTO) projects that were completed during the COVID-19 pandemic witnessed delays of no more than six months, reported Channel News Asia\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"https:\/\/i1.wp.com\/www.siamlandbank.com\/propertynews\/wp-content\/uploads\/2021\/10\/BTO-FLAT-hdb.jpg?fit=820%2C410&ssl=1&resize=350%2C200","width":350,"height":200},"classes":[]},{"id":115568,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/construction-of-bto-flats-to-be-fast-tracked-after-circuit-breaker-period-ends-on-4-may\/","url_meta":{"origin":116467,"position":5},"title":"Construction of BTO flats to be fast-tracked after circuit breaker period ends on 4 May","date":"April 13, 2020","format":false,"excerpt":"\r Construction of BTO projects will be quickened after the circuit breaker period is over.\u00a0 With construction activities for all Build-To-Order (BTO) projects stopped amid the government\u2019s circuit breaker measures, the Housing and Development Board (HDB) revealed that the construction of BTO flats will be expedited following the lifting of\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/116467"}],"collection":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/comments?post=116467"}],"version-history":[{"count":0,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/116467\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/media?parent=116467"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/categories?post=116467"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/tags?post=116467"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}