{"id":111744,"date":"2019-10-21T11:25:27","date_gmt":"2019-10-21T04:25:27","guid":{"rendered":"http:\/\/www.siamlandbank.com\/propertynews\/property-news\/contract-to-install-noise-barriers-along-north-south-east-west-lines-awarded\/"},"modified":"2019-10-21T11:29:49","modified_gmt":"2019-10-21T04:29:49","slug":"contract-to-install-noise-barriers-along-north-south-east-west-lines-awarded","status":"publish","type":"post","link":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/contract-to-install-noise-barriers-along-north-south-east-west-lines-awarded\/","title":{"rendered":"Contract to install noise barriers along North-South, East-West Lines awarded"},"content":{"rendered":"<p>&#013;<br \/>\nOnce completed in 2023, LTA expects the noise barriers to reduce noise levels from passing trains by five to 10 decibels. Image source: LTA<br \/>\nA contract to design and install 5.5km of railway noise barriers under the third phase of the Land Transport Authority\u2019s (LTA) railway noise barrier programme has been awarded to PBT Engineering.<br \/>\nThe contract will cover 16 locations, which runs from Pasir Ris to Kembangan stations along the East-West Line, and from Jurong East to Khatib stations along the North-South Line.<br \/>\nOnce completed in 2023, LTA expects the noise barriers to reduce noise levels from passing trains by five to 10 decibels.<br \/>\nIt noted that the type of noise barriers to be installed depends on the tracks\u2019 profile and noise level.<br \/>\nREAD:\u00a0Are Property Owners Near The Cross Island Line Sitting On A Goldmine?<br \/>\nNoise barriers at turnout sections, where trains switch tracks, \u201chave a semi-enclosed \u201cportal\u201d design to handle the higher noise levels, whereas those along plainline or straight tracks are vertical\u201d.<br \/>\nLTA explained that installing a portal noise barrier usually takes three times as long as vertical barriers due to the larger columns required.<br \/>\nIt also revealed that the installation of noise barriers has \u201cgained momentum due to the implementation of early closures and late openings for MRT stations along the NSEWL\u201d.<br \/>\n\u201cThe additional engineering hours have provided LTA and SMRT with more track access time for maintenance and improvement works, including the installation of noise barriers,\u201d it said.<br \/>\nPhase 1 was completed in 2018, while Phase 2 is expected to be completed by the third quarter of 2020. Installation works for Phase 3 is set to be completed in 2023.<br \/>\n\u201cPhase 3\u2019s completion in 2023 will bring the total length of railway noise barriers installed across the island to 27km,\u201d added LTA.<br \/>\nHome buyers looking for\u00a0Singapore Properties\u00a0may like to visit our\u00a0Listings,\u00a0Project Reviews\u00a0and\u00a0Guides.<br \/>\n\u00a0<br \/>\nVictor Kang, Digital Content Specialist at PropertyGuru, edited this story. To contact him about this or other stories, email\u00a0victorkang@propertyguru.com.sg&#013;<br \/>\n&#013;<br \/>\nSource : proppertyguru.com.sg\/Property Market&#013;<br \/>\nRead more&#8230;<a href=\"https:\/\/www.propertyguru.com.sg\/property-management-news\/2019\/10\/183830\/contract-to-install-noise-barriers-along-north-south-east-west-lines-awarded\" target=\"_blank\">Contract to install noise barriers along North-South, East-West Lines awarded<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&#013; Once completed in 2023, LTA expects the noise barriers to reduce noise levels from passing&#46;&#46;&#46;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"false","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":"","jetpack_is_tweetstorm":false,"jetpack_publicize_feature_enabled":true},"categories":[1],"tags":[],"class_list":["post-111744","post","type-post","status-publish","format-standard","hentry","category-property-news"],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p75ss1-t4k","jetpack-related-posts":[{"id":92004,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/rochor-centre-demolition-to-begin-on-26-june\/","url_meta":{"origin":111744,"position":0},"title":"Rochor Centre demolition to begin on 26 June","date":"June 21, 2018","format":false,"excerpt":"\r The government announced in 2011 that it would acquire Rochor Centre to make way for the North-South Corridor.\u00a0 The demolition of Rochor Centre will commence on 26 June and is set for completion by April 2019, announced the Land Transport Authority (LTA) on Wednesday (20 June). This is in\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":69854,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/demolition-of-rochor-centre-may-affect-surrounding-properties\/","url_meta":{"origin":111744,"position":1},"title":"Demolition of Rochor Centre may affect surrounding properties","date":"October 24, 2017","format":false,"excerpt":"\r The demolition works for Rochor Centre, a public housing estate in the Bugis area dating back to the 1970s, will start early next year to make way for the new expressway. Demolition specialists expect the upcoming demolition of Rochor Centre to negatively affect its surrounding properties, reported The Straits\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":103525,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/lta-awards-615-9m-contract-for-section-of-north-south-corridor\/","url_meta":{"origin":111744,"position":2},"title":"LTA awards $615.9m contract for section of North-South Corridor","date":"January 31, 2019","format":false,"excerpt":"\r Artist\u2019s impression of the cycling routes along the North-South Corridor. Source: LTA A $615.9 million contract has been awarded to build a portion of the North-South Corridor (NSC), an expressway that will link Singapore\u2019s central business district (CBD) with the northern towns, revealed the Land Transport Authority (LTA) on\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":117872,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/lta-awards-four-jurong-region-line-contracts-worth-682-5mil\/","url_meta":{"origin":111744,"position":3},"title":"LTA awards four Jurong Region Line contracts worth $682.5mil","date":"July 20, 2020","format":false,"excerpt":"\r The four contracts include the design and construction of three JRL stations, signalling system and half-height platform screen doors and integrated supervisory control and communications systems.\u00a0 Four contracts totalling $682.5 million for three Jurong Region Line (JRL) MRT stations were awarded by The Land Transport Authority (LTA) on 17\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":110659,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/construction-work-for-5-stations-on-jurong-region-line-to-commence-in-2020\/","url_meta":{"origin":111744,"position":4},"title":"Construction work for 5 stations on Jurong Region Line to commence in 2020","date":"September 11, 2019","format":false,"excerpt":"\r The 24km line will feature 24 stations, including three interchange stations, providing direct connectivity between the western and north-western regions of Singapore. Two civil contracts for the construction of five MRT stations along the Jurong Region Line (JRL) has been awarded by the Land Transport Authority (LTA), with the\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":71715,"url":"https:\/\/www.siamlandbank.com\/propertynews\/property-news\/bukit-brown-road-unlikely-to-be-ready-this-quarter\/","url_meta":{"origin":111744,"position":5},"title":"Bukit Brown road unlikely to be ready this quarter","date":"November 14, 2017","format":false,"excerpt":"\r In order to ease traffic congestion, the LTA has awarded Swee Hong Limited the contract ER 382, Construction of New Road between Adam Flyover and MacRitchie Viaduct. (Photo: Swee Hong) The $134.7 million road in Bukit Brown was originally targeted for completion in end-2017, but motorists and residents affected\u2026","rel":"","context":"In &quot;Property News&quot;","img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"_links":{"self":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/111744"}],"collection":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/comments?post=111744"}],"version-history":[{"count":0,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/posts\/111744\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/media?parent=111744"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/categories?post=111744"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.siamlandbank.com\/propertynews\/wp-json\/wp\/v2\/tags?post=111744"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}